Water-Cementitious Ratio and Ice in Concrete
The water-cementitious ratio is one of the reasons ice works, and the reason it stops working. Meltwater is mix water. Once the approved water is spoken for, cooling has to come from something that does not add more.
On this page
The bound, stated plainly
A mix design states how much water is allowed for the cementitious materials in the batch. That ratio is there for strength, durability, shrinkage, and whatever else the designer was controlling. Ice that replaces part of that water cools the concrete as it melts, and the meltwater occupies the same allowance. Ice added on top of that water is not a cooling trick. It is extra water.
This is elementary, and it is still the point on which summer pours go wrong. A plant under pressure to hit a placement cap will be tempted to charge more ice than the design can accept. The load may come out cooler and still be the wrong concrete. A missed ratio is not a successful cooling job.
The remaining allowance, not the size of the ice plant, is the number that matters. A mix with little water left cannot be rescued by a larger pile of ice. It needs a different cooling method, a different mix approval, or a different pour time.

How this looks in practice
Ask the person responsible for the mix how much batch water can be replaced with ice while remaining inside the approved design. Use that figure, plus chilled water and the planned pour time, to predict whether the placement temperature is realistic in the weather you expect. If the prediction is tight, do not invent a few extra pounds of ice as the plan.
On some jobs the owner will not allow the mix to be changed at all, even if a wetter design could have carried more ice. On those jobs the allowance you have is the allowance you have. Nitrogen injection is then the method that continues cooling without spending it.
We will not publish a typical replacement percentage, because typical is not a specification. Your approved mix is the document.
Where nitrogen fits once the ratio is spoken for
Liquid nitrogen leaves as a gas. The cooling step does not add water and does not change the water-cementitious ratio by itself. That is the entire argument for using it after ice has done what it can, or instead of ice when the allowance is already gone.
It is not an argument for skipping ice when ice would have been enough. If the mix can carry the replacement and the cap is met, stay with ice. If you are combining methods, count the ice against the allowance first, then use nitrogen as trim.
See how much ice cools concrete and ice versus nitrogen.
What to put in the quote request
If you know the remaining ice allowance, include it. If you know that the mix is locked, say that. If you do not know, say that too, and we will ask. A temperature cap with no mix constraint attached is only part of the problem.
Can we add ice without taking out an equal amount of water?
Not without adding water to the mix and changing the ratio. Ice is a replacement, not a free addition.
Does nitrogen change the water-cementitious ratio?
The injection itself does not add water. The ratio remains the ratio of the mix you batched.
Who decides how much ice is allowed?
The approved mix design and the people responsible for it, not the cooling crew.