Concrete Cooling Services

Liquid nitrogen injection for placements that have to hit a temperature in the specification, without adding water to the mix. Start with the service that matches the problem in front of you.

What this service is

Every page in this group describes a way of applying the same core offering: metered liquid nitrogen injection at a batch plant or at the pour site, sized to a specification, a volume, and a placement rate. The differences are the problem you are solving and the audience you are in.

If you already know you need nitrogen, go to the injection page and the quote form. If you are still comparing methods, start with the comparison pages. If the pour is thick enough to carry peak and differential limits, start with mass concrete. If the problem is a hot week and a maximum placement temperature, start with hot-weather concreting.

A boom pump placing concrete for a foundation pour in Enfield, Nova Scotia
Photo: MediaKyle. CC BY-SA 4.0, via Wikimedia Commons.

Core cooling services

These are the pages most contractors and ready-mix producers need first.

Comparisons and limits

Nitrogen is not the first tool you should reach for if ice or chilled water already gets you inside the specification. These pages are written so you can tell the difference before you send a quote request.

Documentation, safety, and planning

A thermal control plan is not satisfied by a cold truck that nobody recorded. These pages cover the work around the pour itself.

Who this is for

General contractors, concrete subcontractors, ready-mix producers, and engineer or owner representatives are the usual callers. The quote form asks for your role because the conversation is different for a plant manager than it is for a project engineer.

Industry and application pages sit beside these service pages: data centers, LNG and industrial work, bridges and heavy civil, wind turbine foundations, power-generation foundations, and DOT structures. Those pages are listed on the resources hub and in the footer.

If you are not sure which page applies, send the specification and the pour date. Sorting the method is part of the work, not a separate engagement.