Services
Concrete Cooling Services
Liquid nitrogen injection for placements that have to hit a temperature in the specification, without adding water to the mix. Start with the service that matches the problem in front of you.
On this page
What this service is
Every page in this group describes a way of applying the same core offering: metered liquid nitrogen injection at a batch plant or at the pour site, sized to a specification, a volume, and a placement rate. The differences are the problem you are solving and the audience you are in.
If you already know you need nitrogen, go to the injection page and the quote form. If you are still comparing methods, start with the comparison pages. If the pour is thick enough to carry peak and differential limits, start with mass concrete. If the problem is a hot week and a maximum placement temperature, start with hot-weather concreting.

Core cooling services
These are the pages most contractors and ready-mix producers need first.
- Liquid nitrogen injection — how the lance works, mobile versus installed, and why the equipment is leased.
- Mass concrete cooling — peak temperature and thermal differential on thick placements.
- Hot weather concreting — holding a maximum placement temperature when the ambient conditions will not cooperate.
- Ready-mix plant cooling — hooking up at the plant so trucks leave already in spec.
- Mobile versus installed injection — which configuration fits a one-off pour or a standing requirement.
- Nitrogen supply and logistics — staging product for a continuous pour, not just the lance itself.
Comparisons and limits
Nitrogen is not the first tool you should reach for if ice or chilled water already gets you inside the specification. These pages are written so you can tell the difference before you send a quote request.
- Four methods compared — nitrogen, ice, chilled water, and aggregate cooling.
- Ice versus liquid nitrogen — what ice can actually buy, and where the water allowance runs out.
- Chiller rental versus nitrogen — when a rented chiller is the right call and when it is not.
- When not to use nitrogen — jobs we will tell you to handle another way.
- What a quote is based on — the inputs that actually change the scope.
Documentation, safety, and planning
A thermal control plan is not satisfied by a cold truck that nobody recorded. These pages cover the work around the pour itself.
- Temperature logging and submittals — the record that supports the plan.
- Safety on a concrete pour — exclusion zones, ventilation, and field practice.
- Planning nitrogen volume — how a continuous pour is staged.
- Lead time and mobilisation — what to send us, and when.
- FAQ — short answers to the questions we hear most often.
Who this is for
General contractors, concrete subcontractors, ready-mix producers, and engineer or owner representatives are the usual callers. The quote form asks for your role because the conversation is different for a plant manager than it is for a project engineer.
Industry and application pages sit beside these service pages: data centers, LNG and industrial work, bridges and heavy civil, wind turbine foundations, power-generation foundations, and DOT structures. Those pages are listed on the resources hub and in the footer.
If you are not sure which page applies, send the specification and the pour date. Sorting the method is part of the work, not a separate engagement.
Additional application and planning pages
These sit next to the core services and are linked from the resources hub as well.
Related Pages
Send Us the Spec and the Pour Date
Tell us the maximum placement temperature, the volume, the location, and when you are pouring.