Plastic Shrinkage and Hot-Weather Concrete

When the surface of fresh concrete dries faster than bleed water can replace the moisture, it can crack while it is still plastic. Hot, dry, or windy weather makes that easier. Cooler concrete is one helping condition, not a complete remedy.

What plastic shrinkage is, in plain terms

Plastic shrinkage cracks form while the concrete is still plastic, often on slabs and other large exposed surfaces, when evaporation at the surface gets ahead of the moisture available there. The usual weather ingredients are high temperature, low humidity, and wind, especially in combination. The usual field responses are about protecting the surface: fogging, evaporation retarders, wind breaks, timely finishing, and curing, as the project’s practice and the specification allow.

This is a well-known hot-weather problem, and it is not the same problem as a maximum placement temperature, even though they often arrive on the same afternoon. A load can be inside a placement cap and still be finished badly on a windy deck. A load can be cooled and still crack if the surface is left unprotected.

We are not a finishing contractor, and this page is not a finishing manual. It exists because people sometimes call for nitrogen when what they are actually describing is a plastic-shrinkage problem, and because cooler concrete can still be part of a serious hot-weather plan.

Workers finishing a freshly poured concrete foundation for a power substation
Photo: MTA Capital Construction Mega Projects. CC BY 2.0, via Wikimedia Commons.

How cooler concrete helps, and how it does not

Cooler fresh concrete can reduce the driving force for evaporation compared with a hotter load in the same air, and it can give the finishing crew a more manageable surface in hot weather. That is one reason placement-temperature caps exist, and one reason a night pour or nitrogen can show up on a slab job that is not mass concrete.

It does not replace evaporation control. It does not extend finishing time indefinitely. It does not cancel wind. If the plan for the surface is weak, cooling the drum will not save the slab. If the plan for the surface is strong and the specification also has a placement cap, cooling and protection should be thought about together, not as rivals.

A clean boundary on our scope

We will cool the concrete to the target we are given. We will not take responsibility for whether the surface is fogged, covered, or finished on time. If someone wants a sentence in a submittal that nitrogen will prevent plastic shrinkage cracks, we will not write that sentence. We will write the temperature we held.

If your actual problem is a placement cap in hot weather, start with hot-weather concreting and ACI 305. If the pour is a slab and you are unsure which problem you are in, send the specification and a short description of the surface plan.

What to send

Send the placement-temperature limit if there is one, the volume, the date, and whether the concern is the specification number, the finishing window, or both. If there is no temperature number and the only concern is plastic shrinkage, you may need a finishing and curing conversation more than a lance. We will say so.

Will nitrogen stop plastic shrinkage cracks?

We will not claim that. Cooler concrete can help the conditions at the surface. Evaporation control and finishing still do the work.

Do slabs need nitrogen if there is no temperature cap?

Not necessarily. If there is no specified temperature to hold, start with scheduling and surface protection. Call us if you are also trying to hold a target of your own.

Is this the same as thermal cracking in mass concrete?

No. Plastic shrinkage happens while the concrete is still plastic, at the surface. Thermal cracking in mass concrete is an in-place, often later, temperature-difference problem.