Mass Concrete
Concrete Temperature Differential Control
A differential limit is not a truck temperature. It is a limit on the difference between points in the pour, usually the hot interior and the cooler surface, as the section heats and then cools.
On this page
What a differential limit is
When a specification caps the temperature difference between the interior and the surface of a mass placement, it is trying to limit the strains that lead to thermal cracking. The number, the sensor locations, and the period over which the limit applies are project-specific. We will not treat any particular differential as a universal rule, because projects do not all use the same one.
The measurement is in-place. It happens after the concrete is in the forms, often over days, on instruments the contractor or the testing laboratory has set. A successful drum reading on the morning of the pour is not evidence that the differential was met, and a missed differential is not always a failed hookup. They are different records.

How precooling helps, and what else has to be right
A cooler starting temperature can lower the peak the interior reaches, all else equal, and that can make a differential easier to live with. Nitrogen injection is a precooling method for that starting temperature, especially when ice cannot carry the mix any further. Mix heat, thickness, formwork, insulation, stripping, and the weather after placement still have a large say in how the interior and the surface move relative to each other.
A classic failure mode is to precool carefully and then leave the surface unprotected on a cold night, or to strip forms in a way the plan did not intend, so the surface drops while the interior is still hot. That is not a nitrogen problem. It is a protection problem. The thermal control plan should say how the surface will be managed, not only how the trucks will be cooled.
Where our scope stops
We hold and document the fresh-concrete temperature we were asked to hold. We do not, unless a job is explicitly arranged otherwise, install or read the in-place sensors that prove a differential. If a plan blurs those duties, the time to un-blur them is before the pour. See monitoring and the cooling record and plan versus cooling scope.
We will not claim that injection “controls differential” as if the lance were a substitute for the plan. We will claim that precooling can be one of the plan’s tools.
What to send
Send the differential limit, the peak limit if there is one, the placement cap if there is one, the section, and the monitoring description. If the plan already assigns the sensors to someone, leave that assignment intact and ask us for the cooling piece only.
Is a differential the same as a placement cap?
No. A placement cap is measured on fresh concrete. A differential is measured in the pour, between locations, after heat has developed.
Can nitrogen hold a differential by itself?
No. It can help the starting temperature. The mix, the protection, and the monitoring are the rest of the plan.
Do you provide the in-place sensors?
Typically that is the contractor’s or testing laboratory’s scope. Ask if your plan needs something different, and we will say whether it is ours.